Ibb:The Governor of Ibb, Abdulwahid Salah, inspected the ongoing rehabilitation work on the Shaban market - Al-Najd Al-Ahmar road. This project, part of the main Ibb-Taiz road, spans two kilometers.
According to Yemen News Agency, the project is being carried out by the General Corporation for Roads and Bridges at a cost of 300 million rials, funded by the Road Maintenance Fund. During his visit, Governor Salah, along with Brigadier General Mohammed Al-Khaled, was briefed by Engineer Ahmed Al-Asri on the project's progress, which includes concrete paving, flood drainage culverts, and side road protection, currently at 50% completion.
The governor emphasized that the project aligns with the directives of the Leader of the Revolution, Sayyid Abdulmalik Badr al-Din al-Houthi, aiming to enhance services, local development, and transportation efficiency. He highlighted the strategic importance of the road in connecting Ibb with other governorates and stressed adherence to the project's specifications and timeline to safeguard the road and facilitate effective rainwater drainage.
Governor Salah also called for continuous monitoring to ensure quality, road sustainability, and improved traffic safety.
