Sanaa:A workshop titled "Designing, Reviewing and Selecting Programs and Projects" commenced at the Center for Energy and Water Studies and Research in Sanaa. The event is part of the National Strategy for the Ministry of Electricity, Energy and Water for the years 1448-1457 AH / 2026-2035, involving 54 directors-general.
According to Yemen News Agency, the workshop is focused on discussing the strategic project portfolio. It aims to transition proposed projects into a strategic portfolio that can be adopted and implemented by verifying their compliance with specific determinants, improving and evaluating them.
Deputy Minister Adel Bader emphasized that the strategic plan for the next decade includes an electricity requirement of 2,015 megawatts, as determined by performance indicators and previous studies. He highlighted the need for ambitious yet implementable plans, with the ministry committed to securing funding through the investment system, the BOT system, and renewable energy. The goal is to achieve 35% of energy production from renewable sources within the next ten years.
Undersecretary for the Electricity Sector Engineer Ahmed Al-Mutawakel stressed the importance of the plan being feasible and prioritized, with deferred projects included in the strategy. Director-General of the Electricity Corporation Dr. Mishaal Al-Rifi pointed out two main challenges securing necessary funding due to limited resources in the water and electricity sectors and overcoming regulatory and administrative obstacles that may impede implementation.
This workshop is the second phase in the preparation of the strategy. The first phase addressed strategic analysis and direction formulation, while the current session focuses on reviewing, evaluating, and mobilizing the listed projects, and identifying ready and deferred ones. Participants are being trained on project selection criteria, review methodologies, and priority classification.
